{"id":13002,"date":"2026-09-11T01:30:00","date_gmt":"2026-09-11T01:30:00","guid":{"rendered":"https:\/\/www.raxpanel.com\/blog\/clean-room-doors-gmp-facilities\/"},"modified":"2026-09-11T01:30:00","modified_gmt":"2026-09-11T01:30:00","slug":"puertas-para-salas-limpias-en-instalaciones-gmp","status":"publish","type":"post","link":"https:\/\/www.raxpanel.com\/es\/blog\/clean-room-doors-gmp-facilities\/","title":{"rendered":"C\u00f3mo elegir puertas de sala limpia para instalaciones BPF"},"content":{"rendered":"<style>\n.entry-content h2 { margin-top: 50px; margin-bottom: 30px; font-size: 28px; font-weight: 700; }\n.entry-content h3 { margin-bottom: 16px; font-weight: 700; font-size: 20px; }\n.entry-content p { line-height: 1.8; margin-bottom: 28px; }\n.entry-content ul { margin-bottom: 28px; padding-left: 20px; list-style-type: disc; }\n.entry-content li { margin-bottom: 10px; line-height: 1.6; }\n.entry-content table { display: table !important; width: 100% !important; border-collapse: collapse; margin-bottom: 28px; font-size: 14px; line-height: 1.6; }\n.entry-content th { padding: 12px 14px; border: 1px solid #e0e0e0; text-align: left; background: #0284c7; color: #ffffff; font-weight: 600; }\n.entry-content td { padding: 12px 14px; border: 1px solid #e0e0e0; vertical-align: top; line-height: 1.6; }\n.entry-content figcaption { font-size: 14px; color: #666666; text-align: center; font-style: italic; margin-top: 8px; }\n<\/style>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">Choose a clean room door for a GMP facility against the grade it separates, not against a generic pharma wish list. That single decision drives the facing, the gasket, the geometry and the documentation an inspector will ask for. Get it wrong and the failure shows up as a differential reading that will not hold at an airlock.<\/p>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">Doors are usually specified last and fail first. The panels are sealed, the air handling is balanced, and then one leaf starts leaking against the cascade. RaxPanel builds clean room door panels alongside its wall, ceiling and partition systems on the same lines. That matters here, because a GMP door has to arrive as part of the envelope rather than as a separate purchase fitted afterwards.<\/p>\n<h2 id=\"what-gmp-grade-requires-from-a-door\">What GMP Grade Requires From a Door<\/h2>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">The grade sets the pressure duty. EU GMP Annex 1 requires a minimum differential of 10 Pa between zones of different classification. ISO 14644-4 design guidance recommends a 5 to 20 Pa gradient, and FDA guidance cites 10 to 15 Pa. Whatever figure your design adopts, the door is the largest moving opening in that boundary.<\/p>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">Leakage is the part most specifications leave vague. Maximum allowable door leakage measured at 50 Pa runs near 0.1 cubic metres per hour at ISO 5, which is Grade A. The allowance rises to about 0.3 at ISO 6 and 7, and to 0.5 at ISO 8. Those numbers convert a claim into a testable requirement.<\/p>\n<div style=\"overflow-x:auto;\">\n<table>\n<thead>\n<tr>\n<th>Grade Zone<\/th>\n<th>Leakage at 50 Pa<\/th>\n<th>Door Expectation<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Grade A, ISO 5<\/td>\n<td>around 0.1 m3\/h<\/td>\n<td>Flush leaf, continuous or inflatable gasket, interlocked<\/td>\n<\/tr>\n<tr>\n<td>Grade B, ISO 6<\/td>\n<td>around 0.3 m3\/h<\/td>\n<td>Stainless or resin face, drop seal, interlocked airlock<\/td>\n<\/tr>\n<tr>\n<td>Grade C, ISO 7<\/td>\n<td>around 0.3 m3\/h<\/td>\n<td>Compression gasket, monitored differential, drop seal<\/td>\n<\/tr>\n<tr>\n<td>Grade D, ISO 8<\/td>\n<td>around 0.5 m3\/h<\/td>\n<td>Coated steel face, perimeter gasket, mechanical drop seal<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">One more loss is easy to overlook. A swinging leaf behaves like a piston, so opening it pulls unfiltered air inward and closing it lifts settled particles back into suspension. A single door cycle can exchange more air than a static threshold gap leaks over several hours.<\/p>\n<figure style=\"margin: 32px 0 28px 0;\">\n  <img fetchpriority=\"high\" decoding=\"async\" src=\"https:\/\/www.raxpanel.com\/wp-content\/uploads\/cleanroom-door-how-pressure-cascades-work-in-cleanrooms-closeup.jpg\" alt=\"How pressure cascades work across cleanroom door boundaries\" width=\"1200\" height=\"675\" loading=\"eager\" class=\"wp-image-11055\" style=\"width: 100%; height: auto; border-radius: 6px;\"><figcaption>Every grade boundary in the cascade is a door, and every door can leak.<\/figcaption><\/figure>\n<h2 id=\"which-materials-meet-pharma-standards\">Which Materials Meet Pharma Standards<\/h2>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">Only non-porous, non-shedding materials belong in a pharmaceutical envelope. Grade 316L stainless is the default where chlorinated disinfectants are routine, because its low carbon content resists the rouging that follows chloride attack. Moulded fibre-reinforced composite is accepted as a void-free alternative. Powder-coated steel is legitimate at ISO 7 and 8, and wood or porous plastic is excluded outright.<\/p>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">Surface finish carries the same weight as the alloy. Stainless faces are specified at a roughness average of 0.8 micrometres or finer. Electropolished leaves reach about 0.38 micrometres where residue retention matters most. A rougher surface holds cleaning agent in its micro-grooves, and the next wipe lifts it back onto the door.<\/p>\n<figure style=\"margin: 32px 0 28px 0;\">\n  <img decoding=\"async\" src=\"https:\/\/www.raxpanel.com\/wp-content\/uploads\/cleanroom-door-what-documentation-keeps-cleanroom-doors-audi-comparison.jpg\" alt=\"Documentation that keeps cleanroom doors audit ready\" width=\"1200\" height=\"800\" loading=\"lazy\" class=\"wp-image-11059\" style=\"width: 100%; height: auto; border-radius: 6px;\"><figcaption>Material evidence is part of the specification, not an afterthought.<\/figcaption><\/figure>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">Sealing is where a pharmaceutical clean room door earns its grade. Double-gasket systems put one gasket on the leaf and a second on the frame, so a single worn edge does not open the boundary. Platinum-cured silicone certified to USP Class VI covers sterile duty, and EPDM compliant with FDA 21 CFR 177.2600 covers water and mild chemical exposure. Expect three to five years of service, and insist on at least 80 percent compression recovery.<\/p>\n<h2 id=\"specifying-flush-geometry-and-vision-panels\">Specifying Flush Geometry and Vision Panels<\/h2>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">Annex 1 asks for surfaces that are smooth, impervious and unbroken, and it points directly at doors that avoid recesses no one can clean. In practice that means flush-mounted hardware, no protruding fasteners and no horizontal ledges anywhere on the leaf. A ledge is a particle trap, and in a sterile suite a particle trap is a microbial reservoir.<\/p>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">Vision panels follow the same rule. Specify double-glazed toughened glass set flush with the door face on both sides. Track-mounted sliding leaves are generally avoided in sterile areas, because the recess that houses the track cannot be wiped clean in a single pass. Where a sliding leaf is unavoidable, choose a concealed track and confirm the cleaning method with your validation team.<\/p>\n<aside class=\"callout callout-tip\" style=\"background: #ecfdf5; border-left: 4px solid #059669; padding: 18px 22px; margin-bottom: 28px;\"><strong>Tip:<\/strong> photograph the finished leaf from the sterile side before handover. A cleaning validation protocol needs evidence that the surface has no ledge, no fastener head and no shadow line to wipe around.<\/aside>\n<div class=\"cta-box\" style=\"background-color: #1a2b3c; border-radius: 6px; padding: 30px; margin: 35px 0; text-align: center;\">\n<h4 style=\"color: #ffffff; margin-top: 0; font-size: 22px;\">Specify Doors to the Grade You Actually Run<\/h4>\n<p style=\"color: #cbd5e1; line-height: 1.8; margin-bottom: 24px; font-size: 15px;\">Tell us the grades in your facility, the disinfectants in use and the airlock arrangement. Our engineers will map each opening to a facing, gasket and hardware set and list the documents your validation pack will need.<\/p>\n<p>  <a href=\"https:\/\/www.raxpanel.com\/clean-room-panel\/clean-room-door-panel\/\" style=\"display: inline-block; background-color: #0ea5e9; color: #ffffff; padding: 12px 24px; border-radius: 4px; text-decoration: none; font-weight: 600; text-transform: uppercase; font-size: 14px;\">Discuss Your Door Schedule<\/a>\n<\/div>\n<h2 id=\"airlocks-interlocks-and-documentation\">Airlocks, Interlocks, and Audit Documents<\/h2>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">A door should not open straight into a lower-grade area. That is why sterile and aseptic suites use airlocks, and why the airlock pair needs an electronic interlock. The device prevents both leaves standing open at once, which would flatten the cascade in seconds. Interlocks also need a visual indicator and an audible alarm, plus a wired contact back to the monitoring system.<\/p>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">Two details keep interlocks from becoming a finding. Emergency egress must override the interlock so nobody is trapped, and the override itself needs a documented test. Control boxes in washdown areas should be rated IP65 or better. A pharmaceutical clean room door is judged on these secondary systems as much as on its face material, because they are what keeps the pressure logic honest after commissioning.<\/p>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">Materials need their own route as well. Pallets, trolleys and ingredient containers should cross a grade boundary through a dedicated pass box rather than the personnel door. Interlocked transfer hatches hold the barrier while the load moves, and an ultraviolet cycle inside the box adds a disinfecting step on outer packaging.<\/p>\n<ul class=\"checklist\" style=\"margin-bottom: 28px; padding-left: 20px; list-style-type: disc;\">\n<li>Grade and leakage limit stated for every opening<\/li>\n<li>Gasket polymer named against the disinfectant list<\/li>\n<li>Flush geometry and vision panel detail agreed before fabrication<\/li>\n<li>Interlock logic, alarm contacts and egress override documented<\/li>\n<li>Material certificate and finish roughness recorded per leaf<\/li>\n<\/ul>\n<figure style=\"margin: 32px 0 28px 0;\">\n  <img decoding=\"async\" src=\"https:\/\/www.raxpanel.com\/wp-content\/uploads\/cleanroom-panel-materials-types-features-specs-which-perform-comparison.jpg\" alt=\"Cleanroom panel materials compared for pharmaceutical performance\" width=\"1200\" height=\"800\" loading=\"lazy\" class=\"wp-image-8880\" style=\"width: 100%; height: auto; border-radius: 6px;\"><figcaption>Panel and leaf materials are judged as one envelope in an audit.<\/figcaption><\/figure>\n<h2 id=\"proving-the-door-at-qualification\">Proving the Door at Qualification<\/h2>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">Qualification is where the specification turns into evidence. Installation qualification confirms the leaf matches the drawing, the clearances and the material certificates. Operational qualification tests the systems under power, including seal performance, interlock function and closing force. Performance qualification then shows the room holding its grade in production.<\/p>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">Three methods verify air leakage. Pressure decay testing measures how fast a sealed volume loses pressure. Smoke visualisation reveals bypass paths while the leaf operates. ISO 14644-7 Annex E sets out the standard pressure change method. The <a href=\"https:\/\/www.iso.org\/standard\/53394.html\" target=\"_blank\" rel=\"noopener noreferrer\">ISO 14644-1 classification standard<\/a> defines what the room must hold, and background on <a href=\"https:\/\/en.wikipedia.org\/wiki\/Cleanroom\" target=\"_blank\" rel=\"noopener noreferrer\">cleanroom classification<\/a> explains how the grades map to particle counts.<\/p>\n<figure style=\"margin: 32px 0 28px 0;\">\n  <img decoding=\"async\" src=\"https:\/\/www.raxpanel.com\/wp-content\/uploads\/cleanroom-panel-materials-types-features-specs-how-to-select-feature.jpg\" alt=\"Selecting cleanroom panel and door materials for qualification\" width=\"1200\" height=\"800\" loading=\"lazy\" class=\"wp-image-8881\" style=\"width: 100%; height: auto; border-radius: 6px;\"><figcaption>Qualification records are what turn a specification into auditable evidence.<\/figcaption><\/figure>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">Two tolerances deserve a line in the installation method statement. The leaf-to-frame clearance should sit consistently near 3 millimetres, and the frame should be checked with a laser level. A deviation beyond about 2 millimetres over the frame height is enough to break gasket compression. Fit the door to those numbers and the leakage test becomes a confirmation rather than a surprise.<\/p>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">Handover documents should include the material certificate for each leaf, the finish roughness record, the leakage test result, the interlock function test and the maintenance schedule. Monthly gasket inspection and annual rebound testing keep the record current. In high-traffic openings, plan on replacing the bottom drop seal every two years. The same envelope logic appears in our notes on <a href=\"https:\/\/www.raxpanel.com\/blog\/gmp-clean-room-panels\/\" target=\"_blank\" rel=\"noopener\">GMP clean room panels<\/a>, and the pressure behaviour behind it is set out in <a href=\"https:\/\/www.raxpanel.com\/blog\/cleanroom-door-standards-pressure-guide\/\" target=\"_blank\" rel=\"noopener\">cleanroom door pressure standards<\/a>.<\/p>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">If the room also crosses a fire compartment line, add a rated leaf to the schedule and confirm the fire class against the wall build-up. The wider classification framework sits in our guide to <a href=\"https:\/\/www.raxpanel.com\/blog\/eu-gmp-cleanroom-classification\/\" target=\"_blank\" rel=\"noopener\">EU GMP cleanroom classification<\/a>. Buying the leaf, frame and panel from one detailing process is what keeps <a href=\"https:\/\/www.raxpanel.com\/clean-room-panel\/clean-room-door-panel\/\" target=\"_blank\" rel=\"noopener\">clean room door panels<\/a> consistent across a facility.<\/p>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">Requalification sets the clock. A door that passed at commissioning still needs its sealing evidence refreshed when the room is requalified, when the airlock logic changes, or after any work that disturbs the frame. Recording those triggers in the maintenance plan stops the door file going stale between audits.<\/p>\n<aside class=\"callout callout-note\" style=\"background: #f8fafc; border-left: 4px solid #64748b; padding: 18px 22px; margin-bottom: 28px;\"><strong>Note:<\/strong> auditors rarely argue with a lower grade that is justified in the design record. They argue with a door that quietly fails the grade the drawing claims.<\/aside>\n<p><!-- raxgate:C1 --><\/p>\n<h2 id=\"frequently-asked-questions\">Frequently Asked Questions<\/h2>\n<p><script type=\"application\/ld+json\" id=\"evo301-geo-ai-block\">\n{\n  \"@context\": \"https:\/\/schema.org\",\n  \"@type\": \"CreativeWork\",\n  \"name\": \"evo301-geo-ai-block\",\n  \"text\": \"A GMP clean room door is specified against the grade it separates. Annex 1 requires a minimum 10 Pa differential between zones of different classification, and door air leakage at 50 Pa is allowed to run near 0.1 cubic metres per hour at ISO 5, 0.3 at ISO 6 and 7, and 0.5 at ISO 8. Acceptable faces are limited to non-porous materials such as 316L stainless, moulded composite and coated steel, held at a roughness average of 0.8 micrometres. Sterile zones use flush geometry, double gaskets with at least 80 percent compression recovery, and interlocked airlock pairs, all evidenced by installation, operational and performance qualification.\"\n}\n<\/script><\/p>\n<div class=\"faq-card\" style=\"margin-bottom: 24px; padding: 20px; background: #f8fafc; border: 1px solid #e2e8f0; border-radius: 6px;\">\n<h3 style=\"margin-top: 0; margin-bottom: 10px; font-size: 18px; color: #1e293b;\">Do GMP doors have to be hermetically sealed?<\/h3>\n<p style=\"line-height: 1.8; margin-bottom: 0; color: #475569;\">Not at every grade. Grade A and B clean zones normally need the tightest sealing, often with inflatable or high-compression silicone gaskets. Grade D openings can use a mechanical drop seal, provided the leakage limit is still met.<\/p>\n<\/div>\n<div class=\"faq-card\" style=\"margin-bottom: 24px; padding: 20px; background: #f8fafc; border: 1px solid #e2e8f0; border-radius: 6px;\">\n<h3 style=\"margin-top: 0; margin-bottom: 10px; font-size: 18px; color: #1e293b;\">Can coated doors pass a pharmaceutical audit?<\/h3>\n<p style=\"line-height: 1.8; margin-bottom: 0; color: #475569;\">Yes, where the surface is smooth, impervious and unbroken. Powder-coated steel is commonly accepted at ISO 7 and ISO 8. Coating build, finish roughness and resistance to your actual disinfectants all need documenting.<\/p>\n<\/div>\n<div class=\"faq-card\" style=\"margin-bottom: 24px; padding: 20px; background: #f8fafc; border: 1px solid #e2e8f0; border-radius: 6px;\">\n<h3 style=\"margin-top: 0; margin-bottom: 10px; font-size: 18px; color: #1e293b;\">What documents should I prepare for an inspection?<\/h3>\n<p style=\"line-height: 1.8; margin-bottom: 0; color: #475569;\">Material certificates for each leaf, finish roughness records, the leakage test result, interlock function tests and the maintenance schedule. Keep them with the room qualification pack rather than in a separate door file.<\/p>\n<\/div>\n<div class=\"faq-card\" style=\"margin-bottom: 24px; padding: 20px; background: #f8fafc; border: 1px solid #e2e8f0; border-radius: 6px;\">\n<h3 style=\"margin-top: 0; margin-bottom: 10px; font-size: 18px; color: #1e293b;\">How often should door seals be revalidated?<\/h3>\n<p style=\"line-height: 1.8; margin-bottom: 0; color: #475569;\">Inspect gaskets monthly and test rebound annually. Replace bottom drop seals every two years in high-traffic openings. Revalidate sealing whenever the room is requalified or the airlock logic changes.<\/p>\n<\/div>\n<div class=\"faq-card\" style=\"margin-bottom: 24px; padding: 20px; background: #f8fafc; border: 1px solid #e2e8f0; border-radius: 6px;\">\n<h3 style=\"margin-top: 0; margin-bottom: 10px; font-size: 18px; color: #1e293b;\">Can an interlock block emergency escape?<\/h3>\n<p style=\"line-height: 1.8; margin-bottom: 0; color: #475569;\">It must not. Specify an egress override that releases the pair on the fire alarm, then test and document that override as part of operational qualification so the function is provable, not assumed.<\/p>\n<\/div>\n<p><script type=\"application\/ld+json\">\n{\n  \"@context\": \"https:\/\/schema.org\",\n  \"@type\": \"Article\",\n  \"@id\": \"https:\/\/www.raxpanel.com\/blog\/clean-room-doors-gmp-facilities\/#article\",\n  \"headline\": \"How to Choose Clean Room Doors for GMP Facilities\",\n  \"description\": \"Choose clean room doors for GMP facilities: grade-by-grade requirements, pharma materials, flush geometry, airlock interlocks and qualification documents.\",\n  \"url\": \"https:\/\/www.raxpanel.com\/blog\/clean-room-doors-gmp-facilities\/\",\n  \"mainEntityOfPage\": \"https:\/\/www.raxpanel.com\/blog\/clean-room-doors-gmp-facilities\/\",\n  \"author\": {\"@type\": \"Organization\", \"name\": \"Raxpanel Cleanroom Engineering Team\", \"url\": \"https:\/\/www.raxpanel.com\/\"},\n  \"publisher\": {\"@type\": \"Organization\", \"name\": \"Raxpanel\", \"url\": \"https:\/\/www.raxpanel.com\/\", \"logo\": {\"@type\": \"ImageObject\", \"url\": \"https:\/\/www.raxpanel.com\/wp-content\/uploads\/logo.png\"}}\n}\n<\/script><\/p>\n<p><script type=\"application\/ld+json\">\n{\n  \"@context\": \"https:\/\/schema.org\",\n  \"@type\": \"FAQPage\",\n  \"@id\": \"https:\/\/www.raxpanel.com\/blog\/clean-room-doors-gmp-facilities\/#faq\",\n  \"mainEntity\": [\n    {\"@type\": \"Question\", \"name\": \"Do GMP doors have to be hermetically sealed?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Not at every grade. Grade A and B clean zones normally need the tightest sealing, often with inflatable or high-compression silicone gaskets. Grade D openings can use a mechanical drop seal, provided the leakage limit is still met.\"}},\n    {\"@type\": \"Question\", \"name\": \"Can coated doors pass a pharmaceutical audit?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Yes, where the surface is smooth, impervious and unbroken. Powder-coated steel is commonly accepted at ISO 7 and ISO 8. Coating build, finish roughness and resistance to your actual disinfectants all need documenting.\"}},\n    {\"@type\": \"Question\", \"name\": \"What documents should I prepare for an inspection?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Material certificates for each leaf, finish roughness records, the leakage test result, interlock function tests and the maintenance schedule. Keep them with the room qualification pack rather than in a separate door file.\"}},\n    {\"@type\": \"Question\", \"name\": \"How often should door seals be revalidated?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Inspect gaskets monthly and test rebound annually. Replace bottom drop seals every two years in high-traffic openings. Revalidate sealing whenever the room is requalified or the airlock logic changes.\"}},\n    {\"@type\": \"Question\", \"name\": \"Can an interlock block emergency escape?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"It must not. Specify an egress override that releases the pair on the fire alarm, then test and document that override as part of operational qualification so the function is provable, not assumed.\"}}\n  ]\n}\n<\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Seleccione una puerta de sala limpia para una instalaci\u00f3n GMP seg\u00fan el grado que separa, no seg\u00fan una lista de deseos farmac\u00e9utica gen\u00e9rica. Esa \u00fanica decisi\u00f3n determina el acabado, la junta, la geometr\u00eda y la documentaci\u00f3n que solicitar\u00e1 un inspector. Errarlo y el fallo se manifiesta como una lectura diferencial que no se mantendr\u00e1\u2026<\/p>","protected":false},"author":2,"featured_media":11053,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","rank_math_title":"GMP Clean Room Door Specs: Grade by Grade","rank_math_description":"Choose clean room doors for GMP facilities: grade-by-grade requirements, pharma materials, flush geometry, airlock interlocks and qualification documents.","rank_math_focus_keyword":"clean room door","rank_math_robots":"","rank_math_canonical_url":"","rank_math_facebook_title":"","rank_math_facebook_description":"","rank_math_twitter_title":"","rank_math_twitter_description":"","_yoast_wpseo_title":"","_yoast_wpseo_metadesc":"","_yoast_wpseo_focuskw":"","_yoast_wpseo_canonical":"","_yoast_wpseo_meta-robots-noindex":"","_yoast_wpseo_meta-robots-nofollow":"","_yoast_wpseo_opengraph-title":"","_yoast_wpseo_opengraph-description":"","_yoast_wpseo_twitter-title":"","_yoast_wpseo_twitter-description":"","_aioseo_title":"","_aioseo_description":"","_aioseo_keywords":"","_aioseo_robots_default":"","_aioseo_robots_noindex":"","_aioseo_og_title":"","_aioseo_og_description":"","_aioseo_twitter_title":"","_aioseo_twitter_description":"","aiosp_title":"","aiosp_description":"","aiosp_keywords":"","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_analysis_target_kw":"","_seopress_robots_canonical":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_genesis_title":"","_genesis_description":"","_genesis_canonical":"","_genesis_noindex":"","_genesis_nofollow":"","slim_seo":""},"categories":[86],"tags":[],"class_list":["post-13002","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-clean-room-systems","category-86","description-off"],"_links":{"self":[{"href":"https:\/\/www.raxpanel.com\/es\/wp-json\/wp\/v2\/posts\/13002","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.raxpanel.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.raxpanel.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.raxpanel.com\/es\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.raxpanel.com\/es\/wp-json\/wp\/v2\/comments?post=13002"}],"version-history":[{"count":0,"href":"https:\/\/www.raxpanel.com\/es\/wp-json\/wp\/v2\/posts\/13002\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.raxpanel.com\/es\/wp-json\/wp\/v2\/media\/11053"}],"wp:attachment":[{"href":"https:\/\/www.raxpanel.com\/es\/wp-json\/wp\/v2\/media?parent=13002"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.raxpanel.com\/es\/wp-json\/wp\/v2\/categories?post=13002"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.raxpanel.com\/es\/wp-json\/wp\/v2\/tags?post=13002"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}